The common term for marked up floor plans (usually in red ink) showing how installation differed from the original design drawings. As-builts are usually created for utilities and in-wall systems that aren’t directly visible. The formal term for as-builts is record drawings.
Also known as As-Built or Record Drawings, these are contract drawings marked up to reflect changes made during the construction process. It is good practice
With Steer, it takes as fast as a few days to drive up efficiency, improve quality, and ultimately avoid delays & cost overruns