Per OSHA 1926.751, a lift that (1) exceeds 75% of the rated capacity of the crane or derrick, or (2) requires the use of more than one crane or derrick.
With Steer, it takes as fast as a few days to drive up efficiency, improve quality, and ultimately avoid delays & cost overruns